SUSPENDED GROUND FLOOR

The ground floor consists of precast concrete floor slabs which rest on RS channels bolted to the stub columns in the basement. Certain precast units have knock-out panels to enable drain socket outlet pipes etc. to be located.

The ground floor components are placed in position following the installation of main service and drainage runs.

Note: In certain instances, service and drainage pipe runs may be suspended from the soffit of the floor slab. Where this is so, the suspended ground floor will be installed at a much earlier stage, following shortly by the completion of the structural frame.

p23_1t

Floor slabs as delivered to site

 
MagnifyClick on photo to enlarge  
p23_3t

Floor slabs in position

p23_2t
p24_1    
p24_2
MK2 Standard precast concrete floor panelacopdflogo2
Cross section
p24_3

p24_4
Longtitudinal section

 
p25
acopdflogotiny  Service Outlet Possibles in FLOOR SLAB Conditions Relating to Partitions
©2004 Oxford Method Royalties Management Group