skip to:
page content
|
links on this page
|
site navigation
|
footer (site information)
Oxford Method Research Programme
Home
2M/3M History
6M Development
Programme
Photographs
Drawings
Inso SpA
Information
search
6M Development
Development of 6M
Main Elements
Building Locations
Internal Elements
Internal Works
Ceilings
Door Frames
Sanitary Ware
6M Internal Partitions
In 2M and 3M observation between bed areas was widely used. The principle has been continued in 6M and single or double glazed areas installed.
Partitions followed the same principle as 2M and 3M. Studding had changed from a timber studding to a metal channel.
©2004 Oxford Method Royalties Management Group