| J Series Drawings - 6M Oxford Method Ventilation & Electrical |
| J | 8 | 1010 | Fire & smoke barrier penetrations - ventilation |
| K Series Drawings - Oxford Method Ventilation & Electrical |
| K | 8 | 1010 | Fire & smoke barrier penetrations-general pipe services insulated or not insulated |
| P Series Drawings - Oxford Method Ventilation & Electrical |
| P | 6 | 1000 | Lightning protection detail | |
| P | 6 | 1001 | Lightning protection details roof connection | |
| P | 6 | 1002 | Structure bonding link at movement joint | |
| P | 6 | 1004 | Lightning conductor details conn to roof away from perimeter & walkway crossover | |
| P | 9 | 1000 | Supports -luminairs flourescent ward & general purpose | |
| P | 9 | 1001 | Support Assembly details | |
| P | 9 | 1003 | Fixing of fluorescent luminaire parallel to t-bars |