
Concrete oversite & steel reinforcing for undercroft |

Steelwork to form undercroft |

Undercroft wall & stud beams |

Precast floor slabs & undercroft |

Steelwork ready to receive floor slabs |

Steelwork in position showing gap for drainage exit |

Slabs being put in position |

Extract ducts in ceiling void |

Extract ducts in ceiling void |

Preformed steel frames |

Unloading the floor slabs |

laying the preformed concrete slabs
|

Floor slabs in position for a two storey building |

Early concrete slabs showing soft spots |

Soft spot showing outlet pipe |

Partitions allow darinage between floors and undercroft |

Partitions allow darinage between floors and undercroft |

Water services and waste shown in partition before second item is fixed into position |

Bath assembly |

Bath assembly |

Medium basin |

Small basin |

Pipework & drainage hidden in partition |

Front view of previous photograph |
| Top |
|

©2004 Oxford Method Royalties Management Group