Asbestos in Oxford Method Buildings

Click on an image to enlarge
p6t
p10_1t p10_2t
 
Column casings in Asbestos incorporated sheeting
The photographs above show the services that are positioned in the ceiling void. The supporting metal angles are shown in place ready to receive the ceiling tiles
p11_1t
p11_2t
p12_1t p12_2t
These photos show the ceiling tiles being placed in position. The sequence of work was to complete the the ceilings and screeds before the partitions were constructed. This has produced a problem where it is intended to remove the ceilings it is not possible to do so without also removing the partitions.
Early Oxford Method partitioning showing how it is fixed to floor and ceiling.

Sanitary services were taken inside the partitions.

The photo shows an early system method of using ballafix valves to isolate the basin in need of repair

p13_1t
p13_2t
p13_3t
Two hatch covers are shown, one at high level and one below the basin