Column casings in Asbestos incorporated sheeting |
The photographs above show the services that are positioned in the ceiling void. The supporting metal angles are shown in place ready to receive the ceiling tiles |
| |
|
 |
 |
|
These photos show the ceiling tiles being placed in position. The sequence of work was to complete the the ceilings and screeds before the partitions were constructed. This has produced a problem where it is intended to remove the ceilings it is not possible to do so without also removing the partitions. |
Early Oxford Method partitioning showing how it is fixed to floor and ceiling. |
Sanitary services were taken inside the partitions.
The photo shows an early system method of using ballafix valves to isolate the basin in need of repair
|
|
|
|
Two hatch covers are shown, one at high level and one below the basin |
|
|
|