As Oxford Method developed the final form of construction was slightly different with each building.
To arrive at a general conclusion is not advised; each building should be assessed on its own condition and position.
As already outlined there is a preferred building for consideration but the other factors must also be taken into account.
To give an appraisal of the Oxford Method Building in 2M and 3M on the Hospital site the notes within the buildings section are intended to highlight information which would be relevant to the Governing Authority when deciding on the building's future.
From the preceeding list of questions many of the items listed are answered within that information.
Those questions not referred to are considered more relevant to the Authority and should be raised at a policy or Board meeting in conjunction with this manual.